15MW Singrauli Solar PV Project


The 15MWp Solar PV project has been developed on approx. 68acre land available to NTPC at MGR loading bulb at the mine end of Singrauli Super Thermal Power Station of NTPC under Phase-I of Jawaharlal Nehru National Solar Mission of Govt. of India. The project is located approx. 15km from the NTPC Singrauli thermal power station was developed through M/s BHEL in 2013 under the EPC model. Power generated is being evacuated to Himachal Pradesh through 132kV switchyard of NTPC Singrauli.

Rated System Power

15MW

Annual Energy Yield

13 million unit

CO2 Saving Per Annum

11.2 metric tonnes